RenewTrack

Hybrid Sizing Optimizer

Optimize solar, wind, and battery sizing for maximum value

Site Constraints

Technologies

Solar PV
Onshore Wind
Battery Storage

Revenue Assumptions

Revenue for firm capacity (battery only)

Advanced Settings

Optimal Sizing

Recommended configuration for maximum NPV

Solar

125 MW

Wind

100 MW

Total

225 MW

LCOE

€30.0/MWh

Project IRR

8.8%

Project NPV

€12.5M

Net Capacity Factor

43.0%

Total CAPEX

€188.8M

Annual Revenue

€22.6M

Curtailment

0.0%

Land Used

197.5 ha (99%)

Payback

10.0 years

Representative Day Profile

Hourly generation, export, and battery state of charge

CAPEX Breakdown

Solar
€68.8M
Wind
€120.0M

Sensitivity Analysis

LCOE vs component sizing

Annual Revenue Breakdown

Energy Revenue

€22.6M

100% of total

Capacity Revenue

€0

0% of total

Ancillary Services

€0

0% of total