RenewTrack

Curtailment Risk Model

Analyze grid curtailment risk by TSO region and technology

Project Location

Click on map or enter coordinates

Curtailment Risk

<3% (Low)
3-8% (Medium)
>8% (High)
Loading map...

Project Parameters

TSO Region

England North

GB

Curtailment Trend

Stable

Queued Capacity

28 GW

Compensation Mechanism

UK Balancing Mechanism

92% of market price

Annual Curtailment (P50)

11.0%

Revenue at Risk

€2M

Expected Compensation

€2M

Net Annual Impact

€140K

42

Risk Score

Medium Risk

P90 Curtailment

14.8%

Lifetime Net Impact

€5M

Curtailment Projection

Projected annual curtailment over project lifetime (P50 and P90)

Financial Impact Over Time

Annual revenue at risk, compensation, and net impact

Regional Comparison

England North compared to other regions for Onshore Wind

RegionCurtailmentCompensationvs Selected
England NorthSelected
8.0%92%-
England SouthGB2.5%90%3.2x higher risk
TransnetBW (Baden-Wurttemberg)DE4.0%100%100% higher risk
ExtremaduraES4.5%0%78% higher risk
AndaluciaES4.5%0%78% higher risk
Amprion (West Germany)DE5.5%100%45% higher risk
AragonES7.0%0%Similar risk
TenneT (North/Central)DE7.5%100%Similar risk
EirGrid EastIE10.0%85%Similar risk

Mitigation Options

Strategies to reduce curtailment risk or impact

Battery Storage Co-location

Add battery storage to capture curtailed energy and shift dispatch to higher-price periods.

Reduction: -4.4%

Cost:High
Applicability:Medium

Flexible Connection Agreement

Negotiate active network management agreement for priority dispatch during constrained periods.

Reduction: -2.2%

Cost:Low
Applicability:Medium

Behind-the-meter Demand Integration

Co-locate with industrial demand (e.g., hydrogen electrolyzer, data center) to consume curtailed energy.

Reduction: -5.5%

Cost:High
Applicability:Medium

Grid Reinforcement Contribution

Participate in or fund grid upgrade works to accelerate connection and reduce constraints.

Reduction: -2.7%

Cost:High
Applicability:Low

Alternative Connection Point

Evaluate connection at different substation or voltage level with less congestion.

Reduction: -3.3%

Cost:Medium
Applicability:Medium